Built to your drawings, or to your climate
Every reference in our catalogue is one execution of a design. The same workshops in Solo produce to your dimensions, your timber and your finish - and, for project work, to drawings you supply.
Two ways in
From a catalogue reference
Send the reference number and say what should change - a different timber, a longer top, a darker finish, a seat height suited to your table. The tooling already exists, so this is the shortest route to a sample.
From your drawings
Hotel, restaurant and retail programmes, or an own-label collection. Send drawings or reference images with your quantities; we come back with a construction proposal before anything is quoted.
How a project runs
Nothing moves to the next step until the previous one is signed off. It is slower on paper and considerably faster in practice, because corrections happen on a prototype rather than on a container.
- 01
Brief
Drawings or reference, quantities, destination port and target timeline.
- 02
Construction proposal
Timber, joinery method, hardware and finish system, written down before pricing.
- 03
Prototype
One piece produced and photographed. Changes are made here, not later.
- 04
Production
Series run against the approved prototype, with inspection at agreed gates.
- 05
Packing & shipment
Carton spec, container plan and export file prepared for your import regime.
Indonesian furniture does not arrive in Indonesian conditions
Solid wood moves with the humidity around it. A piece dried for a European interior and shipped to an air-conditioned building in a desert climate will keep drying after delivery - and that is when joints open and panels split. It is a specification problem, and it is solved before production, not under warranty.
Moisture target
The kiln-dried range is set for the environment the furniture will live in, not for the one it was built in. We ask for your destination and interior conditions before quoting.
Outdoor exposure
Species choice, finish system and maintenance expectations are agreed together - an oiled surface under Gulf sun is a maintenance commitment, not a one-off treatment.
Hardware
Fixings and fittings are specified for the environment, including corrosion resistance for outdoor and coastal installations.
Transit conditions
A container crossing the equator is its own climate. Packing and wrapping are specified for the route, not just for the piece.
Species is stated by its scientific name, with country of production and harvest geolocation, so buyers importing into the European Union can file their due diligence statement.
Tell us the project
Drawings or a catalogue reference, quantities, destination port and the timeline you are working to. Minimum quantities and lead times are confirmed per project - they depend on the piece, not on a blanket rule. We answer within 24 hours.
